Posts

Latest Business Continuity Plan Example,Blog News

Probe Mines Announces 600-Metre Strike Expansion of the High-Grade Zone at
Probe Mines Limited (TSX VENTURE:PRB) ("Probe" or the "Company") is pleased to announce that it has received all results for its expansion drilling program (the "Program") on the Company's Borden Gold project near Chapleau, Ontario. Diamond drill holes …
Read more on SYS-CON Media (press release)

Uracan/UEX report uranium mineralization on the Black Lake Project; ground …

Uracan/UEX report uranium mineralization on the Black Lake Project; ground
The drilling program encountered uranium intersections of 0.131% U3O8 over 0.5 metres and 0.124% U3O8 over 1.0 metres in drill hole BL-148 that is hosted within and adjacent to the Eastern Fault Zone from which previous drilling intercepts on the …
Read more on SYS-CON Media (press release)

Seabridge Gold Files Technical Report on Deep Kerr Deposit
Deep Kerr has excellent continuity of grade vertically and laterally within the deposit, which is helpful for mine planning and lower costs, but there is also a strong apparent improvement in thickness and grade to the north, which was the site of the …
Read more on SYS-CON Media (press release)

Channel Sampling Weighted Average of 29.30 g/t Gold Over 8.0 Meters at Fayolle
… ton of gold over 1 meter. (see table of channel sampling results). It should be noted that a drilling program is currently underway on the Fayolle Project in order to highlight the potential of gold enrichment zones obtained in previous exploration …
Read more on SYS-CON Media (press release)